Biotech Manufacturing Site Bari

Biotech Manufacturing Site Bari

OUR PROJECTS

Biotech Manufacturing Site Bari

This flagship building, part of Merck’s Global Biotech Manufacturing Network encompasses new materials and solutions to grant employees with an optimal work experience. On the inside, the flooring has a sound-absorbing surface and water repellent and non-toxic panels in organic colors. On the outside, the trendy and cutting-edge façade is enveloped by eyrise® dynamic liquid crystal glazing along the north and south sides. Incoming sunlight and heat are controlled by a wall remote control system allowing instant switching. In a warm and sunny region where solar protection is crucial for the wellbeing of a building’s occupants, eyrise® helps with reducing energy consumption and maximizing the amount of light transmitted without losing outside views.

  • Location –
    Modugno-Bari, Italy
  • Contractor –
    Cobar S.p.A.
  • Building Owner –
    Merck Serono S.p.A.
  • Architect –
    Vincenzo De Chirico
  • Installation Date –
    June 2021
  • Product:
    eyrise® s350 Instant Solar Shading Glass
  • Surface:
    148m²
  • Quantity:
    96
  • Geometry:
    Rectangles
  • Type:
    Double glazing
  • Color:
    Neutral grey mixture D
  • Framing System:
    Window System Schücko